[1]殷士勇,鲍劲松,唐仕喜, 等.环锭纺纱信息物理生产系统建模方法[J].纺织学报,2021,42(2):65-73.
YIN Shiyong, BAO Jinsong, TANG Shixi, et al. Modeling method of cyber physical production system for ring spinning[J]. Journal of Textile Research, 2021, 42 (2):65-73.
[2]唐晓凤.信息化时代纺织关联企业的数据分析挖掘及应用[J].棉纺织技术,2021,49(11):87-88.
TANG Xiaofeng. Data analysis mining and application of textile related enterprises in the information age[J]. Cotton Textile Technology, 2021, 49(11):87-88.
[3]马春侠,宋文贺.纺纱企业排产方法研究[J].天津工业大学学报,2011,30(5):26-29.
MA Chunxia, SONG Wenhe. Study on production scheduling method in spinning enterprise[J]. Journal of Tiangong University, 2011, 30(5):26-29.
[4]陈天水. 纺织品制造商采购、排产与交货期决策研究[D].南京:南京大学,2018.
CHEN Tianshui. Study on Purchasing, Scheduling and Delivery Strategy of Textile Manufacturers[D]. Nanjing: Nanjing University, 2018.
[5]练坤玉.订单型纺织生产计划调度系统设计与应用研究[D].合肥:合肥工业大学,2019.
LIAN Kunyu. The Research and Development of Textile Production Management Information System base on Orders[D]. Hefei: Hefei University of Technology, 2019.
[6]王水,王敏其,关会成, 等. 高支精梳棉经编无缝服装的开发[J]. 针织工业,2014,302(3):1-3.
WANG Shui, WANG Minqi, GUAN Huicheng, et al. Development of warp knitted seamless garment with high count combed cotton yarn[J]. Knitting Industries, 2014 , 302(3):1-3.
[7]刘可帅,李婉,余豪, 等. 纺纱三角区形态变化对环锭纱线质量的影响[J].纺织学报,2014, 35(12):36-40.
LIU Keshuai, LI Wan, YU Hao, et al. Influence of spinning triangle shape change on ring spun yarn properties[J]. Journal of Textile Research, 2014, 35(12):36-40.
[8]李霞,郭浩龙,张保威, 等.纺织企业实时订单追踪系统设计与实现[J].现代纺织技术,2015,23(4):35-38.
LI Xia, GUO Haolong, ZHANG Baowei, et al. Design and implementation of real-time order tracking system for textile enterprises[J]. Advanced Textile Technology, 2015, 23(4):35-38.
[9]许文祥,郭顺生,王磊, 等.面向生产任务的建材装备制造企业物料流进度动态管控系统[J]. 计算机集成制造系统,2019,25(3):629-642.
XU Wenxiang, GUO Shunsheng, WANG Lei, et al. Dynamic material flow schedule control system oriented to production tasks for manufacturing enterprise of building material equipment[J]. Computer Integrated Manufacturing Systems, 2019,25(3):629-642.
[10]张炜,王少杰,甘雅文, 等.面向柔性定制的并行不等效客车混装线生产计划主从联合优化[J].机械工程学报,2020,56(22):24-37.
ZHANG Wei, WANG Shaojie, GAN Yawen, et al. Flexible customization oriented leader-follower joint optimization of production planning for parallel and non-equivalence bus mixed-model assembly lines[J]. Journal of Mechanical Engineering, 2020, 56(22): 24 -37.
|